Separate thermal growth in the machine from temperature changes in the part or measurement system.
Look for a time-based pattern
Record actual size alongside time since startup, idle periods and operation sequence. Compare readings at the same location using the same gauge and method. Warm-up effects may be more visible across a long axis or shortly after restarting production.
Separate machine, part and gauge effects
Check a stable reference separately from the production part. Compare readings from parts measured after different stabilization times using the specified inspection condition. Confirm the allowable temperature conditions before interpreting small deviations.
Standardize the check
Document the machine maker’s warm-up procedure and the inspection timing on the setup sheet. Track subsequent readings before making routine offset corrections.
If dimensional drift is one of several recurring defects, see How to Reduce Scrap in CNC Manufacturing.
If the error appears at the first part after a setup change, see Why CNC Work Offsets Are Incorrect.
undefined For help reviewing a program or diagnosing a setup, see CNC programming and prove-out support or work with Tony Williams, who brings 19 years of CNC and manufacturing experience.