How to Expand Manufacturing Capacity Without More Machines

Free manufacturing capacity by identifying the bottleneck, reducing setup losses and protecting accepted output.

Find the constraint on the actual routing

Compare queued work and actual completion rates by operation. Check whether work waits on the spindle, the inspection station, a programmer or material. Track when the queue starts and which part families are most affected.

Recover time at the constraint first

Stage tools and stock before changeover, plan compatible jobs together and move eligible inspections away from the machine. Measure accepted output per shift and ensure the change does not increase rework or add a larger queue downstream.

Review capacity by product mix

A change that helps one job may have little effect on another. Compare the results across representative lots and keep the setup or inspection change only where it frees time on the constrained resource.

If long machine occupancy is limiting output, see How to Reduce CNC Cycle Time.

undefined For help reviewing a program or diagnosing a setup, see CNC programming and prove-out support or work with Tony Williams, who brings 19 years of CNC and manufacturing experience.

About the Author

Need Manufacturing Help?

Get practical support with CNC programming, training, troubleshooting, production improvement and manufacturing leadership.

Need CNC Programming or Training Help?

Get remote or on-site support for CNC programs, difficult setups, employee training and production problems

Need Skilled Manufacturing People?

Connect with machinists, programmers, engineers, quality professionals, technicians and manufacturing leaders.

 

Need More Shop Capacity?

Connect with manufacturing partners for overflow work, specialized equipment and subcontracting support.