Free manufacturing capacity by identifying the bottleneck, reducing setup losses and protecting accepted output.
Find the constraint on the actual routing
Compare queued work and actual completion rates by operation. Check whether work waits on the spindle, the inspection station, a programmer or material. Track when the queue starts and which part families are most affected.
Recover time at the constraint first
Stage tools and stock before changeover, plan compatible jobs together and move eligible inspections away from the machine. Measure accepted output per shift and ensure the change does not increase rework or add a larger queue downstream.
Review capacity by product mix
A change that helps one job may have little effect on another. Compare the results across representative lots and keep the setup or inspection change only where it frees time on the constrained resource.
If long machine occupancy is limiting output, see How to Reduce CNC Cycle Time.
undefined For help reviewing a program or diagnosing a setup, see CNC programming and prove-out support or work with Tony Williams, who brings 19 years of CNC and manufacturing experience.