A manufacturing layout starts with the movement of people, material and information. Map the current path from receiving through inspection, processing, staging and shipping. Record volumes and handling methods before moving equipment on a drawing. For a machine-intensive department, use the CNC machine shop layout guide to account for service access, workholding and material paths. For the storage and dispatch area, build a 3D warehouse layout to test rack placement and aisle clearances before installation. If standard racks cannot accommodate the loads, review how to design custom industrial storage systems before allocating floor space. If the facility will use a metal shell, use the metal building CAD layout guide to coordinate openings and structural bays with the production layout.
Build a measured base plan
Include columns, doors, utility locations, floor elevations and equipment footprints. Model service clearances and the paths required to bring in or remove equipment. Identify which site dimensions came from field measurements.
Compare layouts using typical jobs
Walk representative product flows and test where queues form or where people cross powered material traffic. Coordinate utilities, structure and life-safety requirements with the qualified team. Preserve the assumptions in each layout revision so stakeholders can evaluate changes.
See how to design custom metal parts. For help with a fabrication model or drawing package, explore CAD Design & Product Development and reverse engineering.